Enabler and Developer
in clean and affordable energy
Enabler and Developer
in clean and affordable energy
OUR COMMITMENT
> Turnkey contract
> One-stop guarantee
> A life-cycle service
> Cost-competitive solution
> Reliable and carbon-free power
OUR COMPETITIVE ADVANTAGE
> Decades of solar development experience
> Integrated solar solutions
> Streamlined procurement process
> Fast service response
> Flexible Financing support
SOLAR SOLUTION SCENARIOS
We deliver integrated solar solutions and sell one-stop packages to our customers
Scenario 1: Residential solar project (BAPV)
> Application: Residentials
> Process:
- Confirm the grid connection code and rooftop conditions
- Design the layout of panels and installation solution
- Customize a solar power system (battery is optional)
- The installation and commissioning.
> Estimate installation time: 2-5 days
> Quality guarantee:
25 years of power retention above 80% & 12 years for material, 5 years for Inverter, 3000/6000/8000/10000 cycles & 80% DOD & 25°C (cycle life) for battery, 10 years of mounting rack, up to 10 years for installation.
Scenario 2: Residential solar project (BIPV)
> Application: Residentials
> Process:
- Confirm the grid connection code and rooftop conditions
- Design the layout of solar roof tiles and installation solution
- Customize a solar power system (battery is optional)
- The installation and commissioning.
> Estimate installation time: 5-15 days
Scenario 3: Commercial & Industrial Solar Project (BAPV)
> Application: Rooftops of apartments, C&I buildings
> Process:
- Site inspection and measurement
- Design the layout of solar panels and installation solution
- Customize a solar system based on the customer's demand (battery is optional).
- Make an economic analysis and investment & power offtake solution together with investors.
- EPC and delivery.
> Estimate time: 3 - 6 months
> Typical commercial structure: Building owner as power off-taker, utility or building owner as investor and operator, YATOO Ocean as project developer
Scenario 4: Commercial & Industrial Solar Project (BIPV)
> Application: Rooftops of apartments, C&I buildings
> Process:
- Site inspection and measurement
- Design the layout of BIPV solar glass and installation solution
- Customize a solar system based on the customer's demand (battery is optional).
- Make an economic analysis and investment & power offtake solution together with investors.
- EPC and delivery.
> Estimate time: 6 - 12 months
> Typical commercial structure: Building owner as power off-taker, utility or building owner as investor and operator, YATOO Ocean as project developer
Scenario 5: Utility-scale solar park
> Application: Barren or idle lands close to the power grid
> Process:
- Establish commercial structure and project team with investors, land owners, co-developers, EPC, and other stakeholders.
- Project macro environment evaluation and market analysis.
- Technical analysis and environment impact assessment(EIA).
- Economic assessment and investment & power offtake solution.
- Investment decision-making.
- Licensing process
- EPC and delivery
> Estimate time: approx. 2 years
> Typical commercial structure: Independent Power Producer (IPP) & Special Purpose Vehicle (SPV) module
Scenario 6: Balcony solar system
> Application: Balcony solar system, plug-and-play system
> Process:
- measure the size of your balcony.
- design the capacity of solar panels (550watt, 2279x1134x35mm)
- deliver the package of balcony solar kits (balcony battery is optional).
- Self-installation
- plug into a power outlet and utilize your solar power right away
> Estimate time: 1-5 hours
Scenario 7: Solar fence system
> Application: Gardens, farms, C&I parks...
> Process:
- Site inspection and measurement
- Design the layout of panels and installation solution
- Customize the mounting material and foundation
- Installation and commission
> Estimate time: 3-20 days
Scenario 8: Wall-mounted solar system
> Application: C&I buildings, individual houses
> Process:
- Site inspection and measurement
- Design the layout of panels and installation solution
- Customize the mounting material
Installation and commission
> Estimate time: 3-20 days
Scenario 9: Solar carport, individual and public
> Application:
- Individual residential
- Public parking places, EV charging stations, I&C parking places
> Process:
- Site inspection
- Customize the solar carport kit (Battery and EV charger are optional) and the installation solution.
- The local installer finishes the installation and commissioning.
> Estimate time: 1-5 days
Scenario 10: Solar greenhouse with BIPV glass panel
> Application: Individual residential
> Process:
- Site inspection
- Customize the solar sunroom kit and the installation solution.
- The local installer finishes the installation and commissioning.
> Estimate time: 1-5 days
Scenario 11: Solar air conditioner / Solar heat pump
> Application:
- Individual residential
- Public parking places, EV charging stations, I&C parking places
> Process:
- Site inspection
- Customize the solar carport kit (Battery and EV charger are optional) and the installation solution.
- The local installer finishes the installation and commissioning.
> Estimate time: 1-5 days
Scenario 12: Solar project on board a ship
> Application: Various types of ships
> Process:
- Evaluate deck conditions and compatibility with marine devices.
- Design a layout solution with capacity, solar equipment details, and installation guide.
- Assist the shipowner in submitting the solution to the class for approval.
- EPC and delivery.
> Estimate time: approx. 6 months
> Typical commercial structure: shipowner as project owner and manager, YATOO Ocean as project developer and equipment supplier, shipyard as construction party
Contact:
-> YATOO Ocean AS:
Organization No.:
NO 924 780 347
Birkelundsbakken 1A, Bergen Norway
inf@
-> Our co-developers:
Hungary: SOLXENERGY
Our commitment
To seek an affordable and reliable clean energy solution for society and individuals.
Useful links
© 2023 | YATOO Ocean AS
Website supported by: Strikingly